Python and msproject

Python And Msproject

at Software Informer
Python python-libtorrent-0.15.0

A Cbittorrent library designed to run on anything from embedded systems.

comes with python bindings and

1
Python MySQL-python-1.2.3
 Andy Dustman  374  Freeware
Python MySQL it is a easy-to-use database tool based on api keys.
Python python-libtorrent-0.14.12
 Arvid Norberg  Freeware
libtorrent is a feature complete C++ bittorrent implementation.
Python libxml2-python-2.7.7
6  Daniel Veillard  76  Freeware
Windows binaries for the libxml and libxslt python bindings.
Python python-libtorrent-0.15.9
 Arvid Norberg  2  Freeware
A complete C++ bittorrent implementation focusing on efficiency and scalability.
See non-reviewed python and msproject software
More Python And Msproject
Python And Msproject in introduction
Python
378  Python Software Foundation  709,707  Open source
Create web and desktop applications using an object oriented language.
Python comtypes
1  Python  3,980  Open source
A pure Python COM package based on the ctypes ffi foreign function library.
Python - spyder
57  pythonxy.com  2,278  Open source
A powerful IDE for the Python language with advanced editing and debugging.
wxPython (unicode) for Python
4  wxDesigner  326  Freeware
It contains the infamous wxPython demo, other samples, and wxWidgets docs.
Python - py2exe
3  Thomas Heller  2,163  Freeware
It is a great utility that allows you to create an executable Pythons script.
Python numpy
6  Numpty Developers  19,689  Freeware
NumPy is the library to have if you want advanced calculations in Python.
Additional titles, containing python and msproject
Python pywin32-210
1  Mark Hammond (et al)  2,055  Freeware
Python pywin32-210 is a set of Python extensions for Windows.
Need For Eat
2  Alawar Entertainment  4  Shareware
Need For Eat - Python Return. Python Tournament on Your Desktop!
Python cgkit-2.0.0alpha8
 mbaas  14  Freeware
The Python Computer Graphics Kit is a collection of Python modules.
Python (Stackless)
 Richard Tew  1  Freeware
Stackless Python is an enhanced version of the Python programming language.
OpenOPC for Python
1  Barry Barnreiter  65  Open source
OpenOPC for Python is an easy-to-use OPC library for use with the Python.
Eclipse - Pydev
1  Fabio Zadrozny  101  Freeware
PyDev is a Python IDE for Eclipse, which may be used in Python development.
Python - h5py
1  Andrew Collette  2,178  Open source
HDF5 for Python is a Python interface to the HDF5 library.
Python pyscard-1.6.12
 Jean-Daniel Aussel  31  Open source
Pyscard is a python module adding smart cards support to python.
Python pycrypto-2.3
1  Dwayne C. Litzenberger  322  Freeware
The Python cryptography toolkit provide a stable base for writing Python program.
Python Launcher
5  Vinay Sajip  51,831  Open source
It enables Python scripts to specify the version of Python which should be used.
Non-reviewed