4
wxDesigner
326
Freeware
It contains the infamous wxPython demo, other samples, and wxWidgets docs.
10
SciPy
2,334
Open source
Enhanced interactive Python shell and architecture for parallel computing.
1
nexB Inc.
80
Open source
This program is all you need to start developing Python with Eclipse.
Chris Liechti
563
Freeware
This module encapsulates the access for the parallel port.
Conceptive Engineering
Shareware
It is a Python distribution aimed at development of desktop applications.
ESRI
37
Commercial
It is a guide for users of ArcGIS Desktop to get started with Python scripting.
1
Mark Hammond (et al)
2,055
Freeware
Python pywin32-210 is a set of Python extensions for Windows.
2
Alawar Entertainment
4
Shareware
Need For Eat - Python Return. Python Tournament on Your Desktop!
mbaas
14
Freeware
The Python Computer Graphics Kit is a collection of Python modules.
Richard Tew
1
Freeware
Stackless Python is an enhanced version of the Python programming language.
1
Barry Barnreiter
65
Open source
OpenOPC for Python is an easy-to-use OPC library for use with the Python.
1
Fabio Zadrozny
101
Freeware
PyDev is a Python IDE for Eclipse, which may be used in Python development.
1
Andrew Collette
2,178
Open source
HDF5 for Python is a Python interface to the HDF5 library.
Jean-Daniel Aussel
31
Open source
Pyscard is a python module adding smart cards support to python.
1
Dwayne C. Litzenberger
322
Freeware
The Python cryptography toolkit provide a stable base for writing Python program.
5
Vinay Sajip
51,831
Open source
It enables Python scripts to specify the version of Python which should be used.