Python win msproject

Python Win Msproject

at Software Informer
Python python-libtorrent-0.15.0

A Cbittorrent library designed to run on anything from embedded systems.

comes with python bindings and

1
Python MySQL-python-1.2.3
 Andy Dustman  374  Freeware
Python MySQL it is a easy-to-use database tool based on api keys.
Python python-libtorrent-0.14.12
 Arvid Norberg  Freeware
libtorrent is a feature complete C++ bittorrent implementation.
See non-reviewed python win msproject software
More Python Win Msproject
Python Win Msproject in introduction
Python - pyodbc
1  Michael Kleehammer  420  Open source
Pyodbc is a tool that provides ODBC database connectivity to Python programs.
WinMMA
 David Asorey Álvarez  32  Freeware
It includes a Python interpreter, an editor for MMA files (Scite) and MMA itself.
WinXoundPro
1  Stefano Bonetti  6  Freeware
WinXound is a free and open-source Front-End GUI Editor.
TeXworks
5  TeX Users Group  1,705  Freeware
A text editor specially intended to create printed documents with high quality.
CobraWinLDTP
 Nagappan Alagappan & John Yingjun Li  15  Freeware
CobraWinLDTP is a desktop testing tool for Linux and Windows.
AzSDK PDF Split Merge ActiveX DLL
38  AzSDK Technology  5  Shareware
Split and merge of pdf in your Win programs or Web applications.
Additional titles, containing python win msproject
Python pywin32-210
1  Mark Hammond (et al)  2,055  Freeware
Python pywin32-210 is a set of Python extensions for Windows.
Need For Eat
2  Alawar Entertainment  4  Shareware
Need For Eat - Python Return. Python Tournament on Your Desktop!
Python cgkit-2.0.0alpha8
 mbaas  14  Freeware
The Python Computer Graphics Kit is a collection of Python modules.
Python (Stackless)
 Richard Tew  1  Freeware
Stackless Python is an enhanced version of the Python programming language.
OpenOPC for Python
1  Barry Barnreiter  65  Open source
OpenOPC for Python is an easy-to-use OPC library for use with the Python.
Eclipse - Pydev
1  Fabio Zadrozny  101  Freeware
PyDev is a Python IDE for Eclipse, which may be used in Python development.
Python - h5py
1  Andrew Collette  2,178  Open source
HDF5 for Python is a Python interface to the HDF5 library.
Python pyscard-1.6.12
 Jean-Daniel Aussel  31  Open source
Pyscard is a python module adding smart cards support to python.
Python pycrypto-2.3
1  Dwayne C. Litzenberger  322  Freeware
The Python cryptography toolkit provide a stable base for writing Python program.
Python Launcher
5  Vinay Sajip  51,831  Open source
It enables Python scripts to specify the version of Python which should be used.
Non-reviewed