2
Katmar Software
234
Shareware
Project Risk Analysis is an engineering and risk analysis application.
10
Palisade Corporation
851
Shareware
Performs risk analysis to show possible outcomes in your spreadsheet model.
29
Real Options Valuation, Inc.
56
Shareware
Risk Simulator is a powerful Excel add-in used for applying simulation.
CESVA Instruments s.l.
4
Shareware
Assess the risks arising from workers’ exposure to noise.
8
Hasbro Interactive
536
Shareware
Risk 1.0 is the computer version of the famous strategy board game.
12
Pertmaster Software
99
Commercial
A full risk analytics solution integrating cost and schedule risk management.
IRESS Limited
4
Freeware
Risk Reseacher assists in making considered and appropriate risk decisions.
3
Diabetes Trials Unit, University of Oxford
95
Freeware
The UKPDS Risk Engine provides risk estimates and 95% confidence intervals.
12
Oracle Corporation
577
Commercial
Primavera Risk Analysis is a full lifecycle risk analytics solution.
On Safe Lines Consultancy Ltd
16
Freeware
TIRA is a comprehensive risk management and risk analysis program.
Ferid Mövsümov
10
Freeware
Absolute Risk is a classic "World Domination Risk" game.
Play Buddy
12
Shareware
Wins both types of RISK games using an internal RISK strategy.