Vb6 msproject

Vb6 Msproject

at Software Informer
Code VB6

It allows you to create better Visual Basic code faster.

Code VB6 is a powerful

6
See non-reviewed vb6 msproject software
More Vb6 Msproject
Vb6 Msproject in introduction
phGantTimePackage
 plexityHide.com  8  Shareware
The phGantt and phSchema-components are part of the plexityHide phGantTime.
VBto Converter
9  StressSoft Company Ltd.  523  Shareware
Convert VB6 project to .NET, C#, MS VC++ (MFC), C++Builder, Delphi, Lazarus.
CodeSMART for VB6
1  AxTools  60  Shareware
CodeSMART for Visual Basic 6.0 allows you to analyze and refine codes.
Additional titles, containing vb6 msproject
VB6Tapi
 Microncode.com  Shareware
VB6 TAPI ActiveX for VB6 / VS6 / ASP.
VB Law Workstation
59  Visible Progress Technologies Limited  1
VB Law Workstation is a powerful coding standards enforcement add-in for VB6.
xvnc
 Philip Rotthmann  5  Open source
xVNC is a free extension to tightvnc in vb6 visual basic.
SimplyVBUnit
 Kelly Ethridge  12  Freeware
Builds unit tests in the VB6 IDE with DOT Net Framework support.
SmartVB6
32  OLSOFT  29
Development tools for VB6 programmers created to build fast and robust code.
UniSuite
1  Ponta Negra Enterprises  19
Visual Basic Unicode Controls for Vb6.
TFTPTerminal
 Greg Ward  27  Open source
It is program written in VB6 that connects using TCP and serial connections.
VB 6 Pure Code Lines Calculator
1  TriSun Software Inc.  56  Freeware
Calculate PURE code lines (writing manually) for VB6 project (group).
ActiveWizard
1  R.M. de Boer Software  4
ActiveX control that enables you to create 'Windows 2000 style' wizards in VB6.
MP3 Player ActiveX
 ocx-activex.com  10  Shareware
The control can be run from VB6, VB.NET, C++, ACCESS.
Non-reviewed